Chain Rule — Part 1 MCQs with Explanations

Practice high-yield Mathematics & Quantitative Ability MCQs on Chain Rule — Part 1 with worked academic solutions for CSS, NTS, PPSC, FPSC, PMS.

Questions
40
Difficulty Level
Exam-Level
Target Exams
CSS, NTS, PPSC...
Estimated Time
48 mins
Exam-Level CSS NTS PPSC FPSC PMS
Verified for Commission Syllabus • Oct 14, 2026
40

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/40 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 40
★ CSS ★ NTS

3 pumps, working 8 hours a day, can empty a tank in 2 days. How many hours a day must 4 pumps work to empty the tank in 1 day?

Question 2 of 40
★ CSS ★ NTS

If the cost of x metres of wire is d rupees, then what is the cost of y metres of wire at the same rate?

Question 3 of 40
★ CSS ★ NTS

Running at the same constant rate, 6 identical machines can produce a total of 270 bottles per minute. At this rate, how many bottles could 10 such machines produce in 4 minutes?

Question 4 of 40
★ CSS ★ NTS

A fort had provision of food for 150 men for 45 days. After 10 days, 25 men left the fort. The number of days for which the remaining food will last, is:

Question 5 of 40
★ CSS ★ NTS

39 persons can repair a road in 12 days, working 5 hours a day. In how many days will 30 persons, working 6 hours a day, complete the work?

Question 6 of 40
★ CSS ★ NTS

A man completes $$\frac{5}{8}$$ of a job in 10 days. At this rate, how many more days will it takes him to finish the job?

Question 7 of 40
★ CSS ★ NTS

If a quarter kg of potato costs 60 paise, how many paise will 200 gm cost?

Question 8 of 40
★ CSS ★ NTS

In a dairy farm, 40 cows eat 40 bags of husk in 40 days. In how many days one cow will eat one bag of husk?

Question 9 of 40
★ CSS ★ NTS

A wheel that has 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions mad by the larger wheel is:

Question 10 of 40
★ CSS ★ NTS

If 7 spiders make 7 webs in 7 days, then 1 spider will make 1 web in how many days?

Question 11 of 40
★ CSS ★ NTS

A flagstaff 17.5 m high casts a shadow of length 40.25 m. The height of the building, which casts a shadow of length 28.75 m under similar conditions will be:

Question 12 of 40
★ CSS ★ NTS

In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal?

Question 13 of 40
★ CSS ★ NTS

An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metres of cloth?

Question 14 of 40
★ CSS ★ NTS

36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work?

Question 15 of 40
★ CSS ★ NTS

The price of 357 mangoes is Rs. 1517.25. What will be the approximate price of 49 dozens of such mangoes ?

Question 16 of 40
★ CSS ★ NTS

A snapshot $${\text{1}}\frac{7}{8} \times 2\frac{1}{2}$$ is to be enlarged so that the longer dimension is 4. What will be the dimension of the shorter side ?

Question 17 of 40
★ CSS ★ NTS

A canteen requires 651 bananas for a week. Totally, how many bananas will it require for the months of April, May and June ?

Question 18 of 40
★ CSS ★ NTS

If $$\frac{4}{9}$$ th of a bucket is filled in 1 minute, the rest of it will be filled in ?

Question 19 of 40
★ CSS ★ NTS

On a certain map of India the actual distance of 1450 km between two cities Delhi and Kolkata is shown as 5 cm. What scale is used to draw the map ?

Question 20 of 40
★ CSS ★ NTS

A flagstaff 17.5 m high caste a shadow of length 40.25 m. The height of the building, which casts a shadow of length 28.75 m under similar conditions will be ?

Question 21 of 40
★ CSS ★ NTS

A man completes $$\frac{5}{8}$$ of a job in 10 days. At this rate, how many more days will it take him to finish the job ?

Question 22 of 40
★ CSS ★ NTS

56 men can complete a piece of work in 24 days. In how many days can 42 men complete the same piece of work ?

Question 23 of 40
★ CSS ★ NTS

30 men can do a piece of work in 16 days. How many men would be required to do the same work in 20 days ?

Question 24 of 40
★ CSS ★ NTS

If 7 maids with 7 mops cleaned 7 floors in 7 hours, how long would it take 3 maids to mop 3 floors with 3 mops ?

Question 25 of 40
★ CSS ★ NTS

Four gardeners with four grass mowers mow 400 sq. m of ground in 4 hours. How long would it take for eight gardeners with eight grass mowers to mow 800 sq. m of ground ?

Question 26 of 40
★ CSS ★ NTS

Running at the same constant rate, 6 identical machines can produce a total of 180 bottles per hour. How many bottles could 15 such machines produce on 30 minutes ?

Question 27 of 40
★ CSS ★ NTS

If 6 persons working 8 hours a day earn Rs. 8400 per week, then 9 persons working 6 hours a day will earn per week ?

Question 28 of 40
★ CSS ★ NTS

If 5 workers can collect 60 kg wheat in 3 days, how many kilograms of wheat will 8 workers collect in 5 days ?

Question 29 of 40
★ CSS ★ NTS

50 people consume 350 kg of rice in 30 days. In how many days will 35 people consume 50 kg of rice ?

Question 30 of 40
★ CSS ★ NTS

Working 8 hours a day, 12 men can do a work in 30 days. Working 4 hours a day, 18 men can do work in ?

Question 31 of 40
★ CSS ★ NTS

5 persons can prepare an admission list in 8 days working 7 hours a day. If 2 persons join them so as to complete the work in 4 days, they need to work per day for ?

Question 32 of 40
★ CSS ★ NTS

4 persons can prepare an admission list in 8 days working 7 hours a day. If 3 persons join them so as to complete the work in 4 days, they need to work per day for ?

Question 33 of 40
★ CSS ★ NTS

If 5 men or 7 women can earn Rs. 5250 per day, how much would 7 men and 13 women earn per day ?

Question 34 of 40
★ CSS ★ NTS

3 men or 6 women can do a piece of work in 20 days. In how days will 12 men and 8 women do the same work ?

Question 35 of 40
★ CSS ★ NTS

49 pumps can empty a reservoir in $$6\frac{1}{2}$$ days, working 8 hours a day. If 196 pumps are used for 5 hours each day, then the same work will be complete in ?

Question 36 of 40
★ CSS ★ NTS

30 labourers working 7 hours a day can finish a piece of work in 18 days. If the labourers work 6 hours a day, then the number of labourers to finish the same piece of work in 30 days, will be ?

Question 37 of 40
★ CSS ★ NTS

If 12 carpenters, working 6 hours a day, can make 460 chairs in 24 days, how many chairs will 18 carpenters make in 36 days, each working 8 hours a day ?

Question 38 of 40
★ CSS ★ NTS

If 5 spiders can catch five files in five minutes, how many files can hundred spiders catch in 100 minutes ?

Question 39 of 40
★ CSS ★ NTS

2 persons working 2 hours a day assemble 2 machine in 2 days. The number of machines assemble by 6 persons working 6 hours a day in 6 day is ?

Question 40 of 40
★ CSS ★ NTS

A wall of 100 meters can be built by 7 men or 10 women in 10 days. How many days will 14 men and 20 women take to build a wall of 600 metres ?

✓ Link copied to clipboard
Continue Your Practice

Algebra — Part 1

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Mathematics & Quantitative Ability

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Mathematics & Quantitative Ability

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →