Skip to main content

Time And Work — Part 1 MCQs with Explanations

Practice high-yield Mathematics & Quantitative Ability MCQs on Time And Work — Part 1 with worked academic solutions for CSS, NTS, PPSC, FPSC, PMS.

Questions
40
Difficulty Level
Exam-Level
Target Exams
CSS, NTS, PPSC...
Estimated Time
48 mins
Exam-Level CSS NTS PPSC FPSC PMS
Verified for Commission Syllabus • Oct 14, 2026
40

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/40 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 40
★ CSS ★ NTS

If A and B together can complete a piece of work in 15 days and B alone in 20 days, in how many days can A alone complete the work?

Question 2 of 40
★ CSS ★ NTS

If A and B together can complete a work in 18 days, A and C together in 12 days, and B and C together in 9 days, then B alone can do the work in:

Question 3 of 40
★ CSS ★ NTS

A and B together can complete a work in 3 days. They start together but after 2 days, B left the work. If the work is completed after two more days, B alone could do the work in

Question 4 of 40
★ CSS ★ NTS

A can complete a piece of work in 18 days, B in 20 days and C in 30 days, B and C together start the work and forced to leave after 2 days. The time taken by A alone to complete the remaining work is:

Question 5 of 40
★ CSS ★ NTS

Working 5 hours a day, A can Complete a work in 8 days and working 6 hours a day, B can complete the same work in 10 days. Working 8 hours a day, they can jointly complete the work in:

Question 6 of 40
★ CSS ★ NTS

Ganga and Saraswati, working separately can mow field in 8 and 12 hours respectively. If they work in stretches of one hour alternately. Ganga is beginning at 9 a.m., when will the moving be completed?

Question 7 of 40
★ CSS ★ NTS

If 10 men can do a piece of work in 12 days, the time taken by 12 men to do the same piece of work will be:

Question 8 of 40
★ CSS ★ NTS

To complete a work, A takes 50% more time than B. If together they take 18 days to complete the work, how much time shall B take to do it?

Question 9 of 40
★ CSS ★ NTS

If 10 men or 20 boys can make 260 mats in 20 days, then how many mats will be made by 8 men and 4 boys in 20 days?

Question 10 of 40
★ CSS ★ NTS

A complete $$\frac{7}{{10}}$$ of a work in 15 days, then he completed the remaining work with the help of B in 4 days. In how many day A and B can complete entire work together?

Question 11 of 40
★ CSS ★ NTS

A can complete a piece of work in 36 days, B in 54 days and C in 72 days. All the three began the work the work together but A left 8 days before the completion of the work and B 12 days before the completion of work. Only C worked up to the end. In how many days was the work completed?

Question 12 of 40
★ CSS ★ NTS

While working 7 hour a day, A alone can complete a piece of work in 6 days and B alone in 8 days. In what time would they complete it together, 8 hour a day?

Question 13 of 40
★ CSS ★ NTS

Two pipes, P and Q can fill a cistern in 12 and 15 minutes respectively. Both are opened together, but at the end of 3 minutes, P is turned off. In how many more minutes will Q fill the cistern?

Question 14 of 40
★ CSS ★ NTS

Two pipes can fill an empty tank separately in 24 minutes and 40 minutes respectively and a third pipe can empty 30 gallons of water per minute. If all three pipes are open, empty tanks become full in one hour. The capacity of the tank (in gallons) is:

Question 15 of 40
★ CSS ★ NTS

A cistern can be filled by two pipes in 20 and 30 minutes respectively. Both pipes being opened, when the first pipe must be turned off so that the cistern may be filled in 10 minutes more.

Question 16 of 40
★ CSS ★ NTS

A tank can be filled with water by two pipes A and B together in 36 minutes. If the pipe B was stopped after 30 minutes, the tank is filled in 40 minutes. The pipe B can alone fill the tank in:

Question 17 of 40
★ CSS ★ NTS

A boy and a girl together fill a cistern with water. The boy pours 4 liters of water every 3 minutes and girl pours 3 litres every 4 minutes. How much time will it take to fill 100 litres of water in the cistern?

Question 18 of 40
★ CSS ★ NTS

A tank has a leak which would empty the completely filled tank in 10 hours. If the tank is full of water and a tap is opened which admits 4 litres of water per minutes in the tank, the leak takes 15 hours to empty the tank. how many litres does the tank hold?

Question 19 of 40
★ CSS ★ NTS

A, B and C completed a work costing Rs. 1800. A work for 6 days, B for 4 days and C for 9 days. If their daily wages are in the ratio of 5 : 6 : 4, how much amount will be received by A?

Question 20 of 40
★ CSS ★ NTS

A man and a boy received Rs. 800 as wages for 5 days for the work they did together. The man's efficiency in the work was thrice times that of the boy. What are the daily wages of the boy?

Question 21 of 40
★ CSS ★ NTS

Subhash can copy 50 pages in 10 hours; Subhash and Prakash together can copy 300 pages in 40 hours. In how much time can Prakash copy 30 pages?

Question 22 of 40
★ CSS ★ NTS

An engineer undertakes a project to build a road 15 km long in 300 days and employs 45 men for the purpose. After 100 days, he finds 2.5 km of the road has been completed. Find the (approx.) number of extra men he must employ to finish the work in time.

Question 23 of 40
★ CSS ★ NTS

There is provision of food in fort for 1200 soldiers for 60 days. After 15 days, 200 soldiers leave the fort. Remaining food will last for how many days?

Question 24 of 40
★ CSS ★ NTS

A and B working together completed a job in 5 days. If A works twice as efficiently as he actually did and B works $$\frac{1}{3}$$ of actual efficiency, the work would have completed in 3 days. Find the for A to complete the job alone.

Question 25 of 40
★ CSS ★ NTS

Two pipes A and B can fill a cistern in 12 min and 16 min respectively. Both the pipes are opened together for a certain time but due to some obstruction the flow of water was restricted to $$\frac{7}{8}$$ of full flow in pipe A and $$\frac{5}{6}$$ of full in pipe B. This obstruction is removed after some time and tank is now filled in 3 min from that moment. How long was it before the full flow.

Question 26 of 40
★ CSS ★ NTS

Three pipes A,B and C attached to a cistern. A can fill it in 10 min, B in 15 min, C is a waste pipe for emptying it. After opening both the pipes A and B, a man leaves the cistern and returns when the cistern should have been just full. Finding, however, that the waste pipe had left open, he closes it and the cistern now gets filled in 2 min. In how much time the pipe C, if opened alone, empty the full cistern?

Question 27 of 40
★ CSS ★ NTS

There is a group of 5 boys and 2 girls. The two groups working together can do four times as much work as a boy and a girl. Ratio of working capacities of a boy and a girl is:

Question 28 of 40
★ CSS ★ NTS

A group of 12 men can do a piece of work in 14 days and other group of 12 women can do the same work in 21 days. They begin together but 3 days before the completion of work, man's group leaves off. The total number of days to complete the work is:

Question 29 of 40
★ CSS ★ NTS

Vimal can do a piece of work in 20 days, Vimal and Kamal together can do in 12 days. If Kamal does the work only for half a day daily then in how many days the work will be completed ?

Question 30 of 40
★ CSS ★ NTS

There are three boats A, B and C, working together they carry 60 people in each trip. One day an early morning A carried 50 people in few trips alone. When it stopped carrying the passengers B and C started carrying the people together. It took a total of 10 trips to carry 300 people by A, B and C. It is known that each day on an average 300 people cross the river using only one of the 3 boats A, B and C. How many trips it would take to A to carry 150 passengers alone?

Question 31 of 40
★ CSS ★ NTS

Raj can do a piece of work in 20 days. He started the work and left after some days, when 25% work was done. After it Abhijit joined and completed it working for 10 days. In how many days Raj and Abhijit can do the complete work, working together?

Question 32 of 40
★ CSS ★ NTS

If 10 persons can do a job in 20 days, then 20 person with twice the efficiency can do the same job in:

Question 33 of 40
★ CSS ★ NTS

There was a leakage in the container of the refined oil. If 11 kg oil is leaked out per day then it would have lasted for 50 days, if the leakage was 15 kg per day, then it would have lasted for only 45 days. For how many days would the oil have lasted, if there was no leakage ant it was completely used for eating purpose?

Question 34 of 40
★ CSS ★ NTS

If 2 men or 3 women or 4 boys can do a piece of work in 52 days, then the same piece of work will be done by 1 man, 1 woman and 1 boy in:

Question 35 of 40
★ CSS ★ NTS

If one pipe A can fill a tank in 20 minutes, then 5 pipes, each of 20% efficiency of A, can fill the tank in:

Question 36 of 40
★ CSS ★ NTS

If m men can do a work in r days, then the number of days taken by (m + n) men to do it is :

Question 37 of 40
★ CSS ★ NTS

X takes 4 days to complete one-third of a job. Y takes 3 days to complete one-sixth of the job and Z takes 5 days to complete half the job. If all of them work together for 3 days and X and Z quit, how long will it take for Y to complete the remaining work done.

Question 38 of 40
★ CSS ★ NTS

Two typist of varying skills can do a job in 6 minutes if they work together. If the first typist typed alone for 4 minutes and then the second typist typed alone for 6 minutes, they would be left with $$\frac{1}{5}$$ of the whole work. How many minutes would it take the slower typist to complete the typing job working alone ?

Question 39 of 40
★ CSS ★ NTS

A and B completed a work together in 5 days. had A worked at twice the speed and B at half the speed, it would have taken them four days to complete the job. How much time would it take for A alone to do the work?

Question 40 of 40
★ CSS ★ NTS

Two forest officials in their respective division were involved in the harvesting of tendu leave. One division had an average output of 21 tons from a hectares and other division, which had 12 hectares of land less, dedicated to tendu leaves, got 25 tons of tendu from a hectare. As a result, the second division harvested 300 tons of tendu leaves more than the first. How many tons of tendu leaves did the first division harvest.

✓ Link copied to clipboard
Continue Your Practice

Algebra — Part 1

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Mathematics & Quantitative Ability

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Mathematics & Quantitative Ability

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →