Construction Planning And Management — Part 1 MCQs with Explanations

Practice high-yield Civil Engineering MCQs on Construction Planning And Management — Part 1 with worked academic solutions for PPSC SDO, FPSC AEE, C&W, Irrigation, NTS.

Questions
40
Difficulty Level
Exam-Level
Target Exams
PPSC SDO, FPSC AEE, C&W...
Estimated Time
48 mins
Exam-Level PPSC SDO FPSC AEE C&W Irrigation NTS
Verified for Commission Syllabus • Oct 14, 2026
40

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/40 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 40
★ PPSC SDO ★ FPSC AEE

Bar charts are suitable for

Question 2 of 40
★ PPSC SDO ★ FPSC AEE

For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is

Question 3 of 40
★ PPSC SDO ★ FPSC AEE

For a given size of bucket, the ideal output of a dragline will be least in

Question 4 of 40
★ PPSC SDO ★ FPSC AEE

Works costing less than Rs. 20,000 are treated as

Question 5 of 40
★ PPSC SDO ★ FPSC AEE

An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is

Question 6 of 40
★ PPSC SDO ★ FPSC AEE

Power stations are generally treated as

Question 7 of 40
★ PPSC SDO ★ FPSC AEE

The normal time required for the completion of project in the above problem is

Question 8 of 40
★ PPSC SDO ★ FPSC AEE

If t o , t p and t m are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be

Question 9 of 40
★ PPSC SDO ★ FPSC AEE

A construction schedule is prepared after collecting

Question 10 of 40
★ PPSC SDO ★ FPSC AEE

If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively

Question 11 of 40
★ PPSC SDO ★ FPSC AEE

The first stage of a construction, is

Question 12 of 40
★ PPSC SDO ★ FPSC AEE

A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be

Question 13 of 40
★ PPSC SDO ★ FPSC AEE

The probability of completion of any activity within its expected time is

Question 14 of 40
★ PPSC SDO ★ FPSC AEE

For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days respectively, The expected time is

Question 15 of 40
★ PPSC SDO ★ FPSC AEE

For the network shown in the given figure, the expected time for the activity

Question 16 of 40
★ PPSC SDO ★ FPSC AEE

Time and progress chart of a construction, is also known as

Question 17 of 40
★ PPSC SDO ★ FPSC AEE

The difference between the time avail-to do a job and the time required to do the job, is known as

Question 18 of 40
★ PPSC SDO ★ FPSC AEE

The Overall in-charge of an organization at the site responsible for the execution of the works, is

Question 19 of 40
★ PPSC SDO ★ FPSC AEE

Various activities of a project, are shown on bar charts by

Question 20 of 40
★ PPSC SDO ★ FPSC AEE

The main disadvantage of line organization, is

Question 21 of 40
★ PPSC SDO ★ FPSC AEE

The main principle of an organization, is

Question 22 of 40
★ PPSC SDO ★ FPSC AEE

A critical ratio scheduling

Question 23 of 40
★ PPSC SDO ★ FPSC AEE

A golden rule for the procurement of construction stones, suggests

Question 24 of 40
★ PPSC SDO ★ FPSC AEE

If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is

Question 25 of 40
★ PPSC SDO ★ FPSC AEE

A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling resistance of the road will be

Question 26 of 40
★ PPSC SDO ★ FPSC AEE

A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling resistance of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will

Question 27 of 40
★ PPSC SDO ★ FPSC AEE

The time with which direct cost does not reduce with the increase in time is known as

Question 28 of 40
★ PPSC SDO ★ FPSC AEE

If the gross vehicle weight of a truck is 30 tonne and rolling resistance is 30 kg/tonne, then the tractive effort required to keep the truck moving at a uniform speed is

Question 29 of 40
★ PPSC SDO ★ FPSC AEE

Frederick W. Taylor introduced a system of working known as

Question 30 of 40
★ PPSC SDO ★ FPSC AEE

For the execution of a project, a contractor is

Question 31 of 40
★ PPSC SDO ★ FPSC AEE

An earth moving equipment costs Rs. 5,00,000 and has an estimated life of 10 years and a salvage value of Rs. 50,000. What uniform annual amount must be set aside at the end of each of the 10 years for replacement if the interest rate is 8% per annum and if the sinking fund factor at 8% per annum interest rate for 10 years is 0.069?

Question 32 of 40
★ PPSC SDO ★ FPSC AEE

If the expected time for completion of a project is 10 days with a standard deviation of 2 days, the expected time of completion of the project with 99.9% probability is

Question 33 of 40
★ PPSC SDO ★ FPSC AEE

A dummy activity

Question 34 of 40
★ PPSC SDO ★ FPSC AEE

A Milestone chart

Question 35 of 40
★ PPSC SDO ★ FPSC AEE

Consider the following features/factors: 1. Projects are of the non-repetitive type 2. Time required need not be known 3. Time required is known precisely 4. Events have been established for planning 5. Emphasis is given to activities of project PERT is preferred for planning because of

Question 36 of 40
★ PPSC SDO ★ FPSC AEE

Consider the following statements: In the bar chart planning 1. Interdependence of the operations cannot be portrayed. 2. Progress of work can be measured. 3. Spare time of the activities can be determined. 4. Schedule cannot be updated.

Question 37 of 40
★ PPSC SDO ★ FPSC AEE

Batching refers to

Question 38 of 40
★ PPSC SDO ★ FPSC AEE

Military organization is known as

Question 39 of 40
★ PPSC SDO ★ FPSC AEE

Critical path lies along the activities having total float

Question 40 of 40
★ PPSC SDO ★ FPSC AEE

Slack time refers to

✓ Link copied to clipboard
Continue Your Practice

Airport Engineering — Part 1

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Civil Engineering

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Civil Engineering

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →