Estimating And Costing — Part 1 MCQs with Explanations
Practice high-yield Civil Engineering MCQs on Estimating And Costing — Part 1 with worked academic solutions for PPSC SDO, FPSC AEE, C&W, Irrigation, NTS.
Questions
40
Difficulty Level
Exam-Level
Target Exams
PPSC SDO, FPSC AEE, C&W...
Estimated Time
48 mins
Exam-Level PPSC SDO FPSC AEE C&W Irrigation NTS
Verified for Commission Syllabus • Oct 14, 2026
40
Verified Practice Questions
Interactive test mode with detailed academic worked solutions
Live Progress|0/40 answered
✓0 correct
✗0 wrong
0% score
🎉 Set complete! All 40 questions answered.
Question 1 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
Correct Answer: Option D — 2000 m3
Detailed Academic Explanation:
We're asked to find the volume of box cutting needed for a concrete road. Think of "box cutting" as the amount of soil we need to remove (excavate) to create space for the road. The road is made of two layers: 1. A 15 cm thick concrete layer . 2. A 10 cm thick gravel sub-base layer . Box cutting is all about how much earth you need to remove, so we only care about the final dimensions of the road profile. So, we need to consider both layers (concrete and gravel) to determine the total depth of the excavation. 1. Calculate the total thickness: The total thickness is 15 cm (concrete) + 10 cm (gravel) = 25 cm. We need to convert this to meters: 25 cm = 0.25 m 2. Calculate the volume: Volume is calculated by: Length x Width x Height (or Thickness in this case) Length = 1000 m Width = 8 m Thickness = 0.25 m Volume = 1000 m x 8 m x 0.25 m = 2000 m 3 Therefore, the correct answer is Option D: 2000 m 3
💡Key Conceptual Anchor:Estimating And Costing
Question 2 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The main factor to be considered while preparing a detailed estimate, is
Correct Answer: Option D — All the above
Detailed Academic Explanation:
Definition: A detailed estimate is a comprehensive calculation of the quantities and costs of all items required for the execution of a construction project. Main factors: While preparing a detailed estimate, several aspects must be considered, including the quantity of materials , their availability , and the transportation arrangements to the site. Reason: The quantity of materials directly affects the total cost and ensures sufficient supply for uninterrupted work. The availability of materials determines procurement timelines and can influence choice of suppliers and scheduling. The transportation of materials impacts delivery efficiency, cost, and timely completion of the project. Conclusion: All these factors are interlinked and crucial for accurate cost estimation and smooth project execution, hence all the above is the correct answer.
💡Key Conceptual Anchor:Estimating And Costing
Question 3 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
Berms are provided in canals if these are
Correct Answer: Option B — Partly in excavation and partly in embankment
Detailed Academic Explanation:
The correct answer is Option B: Partly in excavation and partly in embankment . In canal engineering, berms are provided when they are partly in excavation and partly in embankment. This is done to stabilize the slopes of the canal and prevent erosion. Berms act as horizontal shelves on the sides of the canal, providing support to the excavated and embanked portions. Option A: Fully in excavation is incorrect because berms are not exclusively in excavation. Option C: Fully in embankment is incorrect because berms are not exclusively in embankment. Option D: All the above is incorrect because the correct condition for providing berms is when they are partly in excavation and partly in embankment, not fully in either.
💡Key Conceptual Anchor:Estimating And Costing
Question 4 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 5 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
Size, capacity and materials need be specified for
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “Size, capacity and materials need be specified for”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 6 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The expected out turn of 12 mm plastering with cement mortar is
Correct Answer: Option D — 8.0 sq m
Detailed Academic Explanation:
8.0 sq m is the correct answer to “The expected out turn of 12 mm plastering with cement mortar is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 7 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
Correct Answer: Option D — Surface excavation
Detailed Academic Explanation:
Surface excavation is the correct answer to “The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 8 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
Correct Answer: Option B — $${\text{Bd}} + {\text{S}}{{\text{d}}^2}$$
Detailed Academic Explanation:
$${\text{Bd}} + {\text{S}}{{\text{d}}^2}$$ is the correct answer to “If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 9 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The rate of payment is made for 100 cu m (per % cu m) in case of
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “The rate of payment is made for 100 cu m (per % cu m) in case of”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 10 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
Correct Answer: Option D — 5.0 %
Detailed Academic Explanation:
5.0 % is the correct answer to “Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 11 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The value of 'A' of Indian type W.C. shown in the given figure is:
Correct Answer: Option B — 30 cm
Detailed Academic Explanation:
30 cm is the correct answer to “The value of 'A' of Indian type W.C. shown in the given figure is:”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 12 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The value of 'C' of Indian type W.C. shown in the given figure is:
Correct Answer: Option C — 500 mm
Detailed Academic Explanation:
500 mm is the correct answer to “The value of 'C' of Indian type W.C. shown in the given figure is:”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 13 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The value of 'B' of Indian type W.C. shown in the given figure is:
Correct Answer: Option A — 45 cm
Detailed Academic Explanation:
45 cm is the correct answer to “The value of 'B' of Indian type W.C. shown in the given figure is:”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 14 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The area of the cross-section of a road fully in banking shown in the given figure, is
$$\frac{{{\text{s}}{{\text{b}}^2} + {{\text{r}}^2}{{\left( {2{\text{bd}} + {\text{sd}}} \right)}^2}}}{{{{\text{r}}^2} - {{\text{s}}^2}}}$$ is the correct answer to “The area of the cross-section of a road fully in banking shown in the given figure, is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 15 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The concrete work for the following part of the building of specified thickness is measured in square meters
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “The concrete work for the following part of the building of specified thickness is measured in square meters”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 16 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Correct Answer: Option D — 5.0 m3
Detailed Academic Explanation:
5.0 m3 is the correct answer to “The expected out turn of cement concrete 1 : 2 : 4 per mason per day is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 17 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The expected out turn of half brick partition wall per mason per day is
Correct Answer: Option D — 5.0 m2
Detailed Academic Explanation:
5.0 m2 is the correct answer to “The expected out turn of half brick partition wall per mason per day is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 18 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The measurement is made in square metre in case of
Correct Answer: Option D — None of these
Detailed Academic Explanation:
None of these is the correct answer to “The measurement is made in square metre in case of”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 19 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The measurement is made for stone work in square metre in case of
Correct Answer: Option D — (A) and (B) of the above
Detailed Academic Explanation:
(A) and (B) of the above is the correct answer to “The measurement is made for stone work in square metre in case of”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 20 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 21 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
Pick up the correct statement in case of water supply.
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “Pick up the correct statement in case of water supply.”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 22 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
Correct Answer: Option C — Rs. 450
Detailed Academic Explanation:
Rs. 450 is the correct answer to “The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 23 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
For the construction of buildings, the subheads of the estimate are
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “For the construction of buildings, the subheads of the estimate are”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 24 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The damp proof course (D.P.C.) is measured in
Correct Answer: Option B — Sq. m
Detailed Academic Explanation:
Sq. m is the correct answer to “The damp proof course (D.P.C.) is measured in”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 25 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
Correct Answer: Option B — 150 mm
Detailed Academic Explanation:
150 mm is the correct answer to “The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 26 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The area of a sloping surface of a protective embankment of mean height ‘d’, side slopes S : 1 and length ‘L’ is
Correct Answer: Option C — $${\text{Ld}}\sqrt {1 + {{\text{s}}^2}} $$
Detailed Academic Explanation:
$${\text{Ld}}\sqrt {1 + {{\text{s}}^2}} $$ is the correct answer to “The area of a sloping surface of a protective embankment of mean height ‘d’, side slopes S : 1 and length ‘L’ is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 27 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The detention period in a septic tank is assumed
Correct Answer: Option C — 30 minutes
Detailed Academic Explanation:
30 minutes is the correct answer to “The detention period in a septic tank is assumed”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 28 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
Carpet area does not include the area of
Correct Answer: Option D — None of the above
Detailed Academic Explanation:
None of the above is the correct answer to “Carpet area does not include the area of”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 29 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
While estimating the qualities for the construction of a building, the correct metric unit is
Correct Answer: Option D — Liter for capacity
Detailed Academic Explanation:
Liter for capacity is the correct answer to “While estimating the qualities for the construction of a building, the correct metric unit is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 30 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The volume is measured correct to the nearest
Correct Answer: Option A — 0.01 cum
Detailed Academic Explanation:
0.01 cum is the correct answer to “The volume is measured correct to the nearest”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 31 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The area is measured correct to the nearest
Correct Answer: Option A — 0.01 sqm
Detailed Academic Explanation:
0.01 sqm is the correct answer to “The area is measured correct to the nearest”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 32 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
While preparing a detailed estimate
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “While preparing a detailed estimate”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 33 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The plinth area of a building not includes
Correct Answer: Option D — Area of cantilevered porch
Detailed Academic Explanation:
Area of cantilevered porch is the correct answer to “The plinth area of a building not includes”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 34 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
In the mid-section formula
Correct Answer: Option D — All of the above
Detailed Academic Explanation:
All of the above is the correct answer to “In the mid-section formula”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 35 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The inspection pit or chamber is a manhole provided in a base drainage system
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “The inspection pit or chamber is a manhole provided in a base drainage system”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 36 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
$$\left( {{{\text{b}}_1} + {{\text{b}}_2}} \right) + 2{\text{s}}{{\text{h}}^2}$$ is the correct answer to “The cross-sectional area of the embankment of a canal fully in embankment in the given figure is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 37 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
Anti-siphonage pipe is connected to
Correct Answer: Option C — Top of P trap W.C.
Detailed Academic Explanation:
Top of P trap W.C. is the correct answer to “Anti-siphonage pipe is connected to”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 38 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
The 'centre line method' is specially adopted for estimating
Correct Answer: Option D — All the above
Detailed Academic Explanation:
All the above is the correct answer to “The 'centre line method' is specially adopted for estimating”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 39 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
Correct Answer: Option B — Half breadth of wall on each side
Detailed Academic Explanation:
Half breadth of wall on each side is the correct answer to “In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
Question 40 of 40
★ PPSC SDO
★ FPSC AEE
★ PPSC SDO
★ FPSC AEE
According to ISI method of measurement, the order of the sequence is
Correct Answer: Option A — Length, breadth, height
Detailed Academic Explanation:
Length, breadth, height is the correct answer to “According to ISI method of measurement, the order of the sequence is”. This question is standard in competitive examination syllabi for Estimating And Costing.
💡Key Conceptual Anchor:Estimating And Costing
✓Link copied to clipboard
Continue Your Practice
Airport Engineering — Part 1
Master the next curriculum module with 40 exam-standard MCQs.
In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.