Estimating And Costing — Part 2 MCQs with Explanations

Practice high-yield Civil Engineering MCQs on Estimating And Costing — Part 2 with worked academic solutions for PPSC SDO, FPSC AEE, C&W, Irrigation, NTS.

Questions
40
Difficulty Level
Exam-Level
Target Exams
PPSC SDO, FPSC AEE, C&W...
Estimated Time
48 mins
Exam-Level PPSC SDO FPSC AEE C&W Irrigation NTS
Verified for Commission Syllabus • Oct 14, 2026
40

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/40 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 40
★ PPSC SDO ★ FPSC AEE

The rate of an item of work depends on

Question 2 of 40
★ PPSC SDO ★ FPSC AEE

The cross-sections for a highway is taken at

Question 3 of 40
★ PPSC SDO ★ FPSC AEE

If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm 2 and bond stress is 6 kg/cm 2 , the required bond length of the rod is

Question 4 of 40
★ PPSC SDO ★ FPSC AEE

The most reliable estimate is

Question 5 of 40
★ PPSC SDO ★ FPSC AEE

The order of booking dimensions is

Question 6 of 40
★ PPSC SDO ★ FPSC AEE

The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

Question 7 of 40
★ PPSC SDO ★ FPSC AEE

The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

Question 8 of 40
★ PPSC SDO ★ FPSC AEE

Pick up the correct statement regarding the centre line method of estimating a building

Question 9 of 40
★ PPSC SDO ★ FPSC AEE

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

Question 10 of 40
★ PPSC SDO ★ FPSC AEE

For 100 sq. m cement concrete (1 : 2 : 4) 4 cm thick floor, the quantity of cement required, is

Question 11 of 40
★ PPSC SDO ★ FPSC AEE

The measurement is not made in square meters in case of

Question 12 of 40
★ PPSC SDO ★ FPSC AEE

The brick work is measured in sq metre, in case of

Question 13 of 40
★ PPSC SDO ★ FPSC AEE

According to Indian Standards Institute, the actual size of modular bricks is

Question 14 of 40
★ PPSC SDO ★ FPSC AEE

The brick work is not measured in cu m in case of

Question 15 of 40
★ PPSC SDO ★ FPSC AEE

While estimating a reinforced cement structure, the omitted cover of concrete is assumed

Question 16 of 40
★ PPSC SDO ★ FPSC AEE

Pick up the item of work not included in the plinth area estimate

Question 17 of 40
★ PPSC SDO ★ FPSC AEE

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2 : 1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is

Question 18 of 40
★ PPSC SDO ★ FPSC AEE

Pick up the incorrect statement regarding a master trap from the following:

Question 19 of 40
★ PPSC SDO ★ FPSC AEE

Referring of given figure, pick up the correct statement from the following:

Question 20 of 40
★ PPSC SDO ★ FPSC AEE

The height of the sink of wash basin above floor level is kept

Question 21 of 40
★ PPSC SDO ★ FPSC AEE

The unit of measurement is per quintal for the following:

Question 22 of 40
★ PPSC SDO ★ FPSC AEE

The slope of the outlet of 'P trap' below the horizontal is kept

Question 23 of 40
★ PPSC SDO ★ FPSC AEE

The expected out turn for earth work in excavation in ordinary soil per workman per day is

Question 24 of 40
★ PPSC SDO ★ FPSC AEE

The weight of an item is measured correct to nearest

Question 25 of 40
★ PPSC SDO ★ FPSC AEE

The expected out turn of 2.5 cm cement concrete floor per mansion per day

Question 26 of 40
★ PPSC SDO ★ FPSC AEE

Cost of fittings and their fixing is specified for the following sanitary fittings

Question 27 of 40
★ PPSC SDO ★ FPSC AEE

The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

Question 28 of 40
★ PPSC SDO ★ FPSC AEE

Pick up the item whose weight is added to the weight of respective item, is

Question 29 of 40
★ PPSC SDO ★ FPSC AEE

Brick walls are measured in sq. m if the thickness of the wall is

Question 30 of 40
★ PPSC SDO ★ FPSC AEE

The item of steel work which is measured in sq.m, is

Question 31 of 40
★ PPSC SDO ★ FPSC AEE

The item of the brick structure measured in sq.m, is

Question 32 of 40
★ PPSC SDO ★ FPSC AEE

The following item of earth work is not measured separately.

Question 33 of 40
★ PPSC SDO ★ FPSC AEE

The trap which is provided to disconnect the house drain from the street sewer is called

Question 34 of 40
★ PPSC SDO ★ FPSC AEE

Pick up the excavation where measurements are made in square meters for payment.

Question 35 of 40
★ PPSC SDO ★ FPSC AEE

A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2 : 1, the earth work involved.

Question 36 of 40
★ PPSC SDO ★ FPSC AEE

The floor area includes the area of the balcony up to

Question 37 of 40
★ PPSC SDO ★ FPSC AEE

In case of laying gullies, siphons, intercepting traps, the cost includes

Question 38 of 40
★ PPSC SDO ★ FPSC AEE

The minimum width of a septic tank is taken

Question 39 of 40
★ PPSC SDO ★ FPSC AEE

The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

Question 40 of 40
★ PPSC SDO ★ FPSC AEE

The correct Prismoidal formula for volume is

✓ Link copied to clipboard
Continue Your Practice

Airport Engineering — Part 1

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Civil Engineering

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Civil Engineering

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →