Irrigation Engineering — Part 1 MCQs with Explanations

Practice high-yield Civil Engineering MCQs on Irrigation Engineering — Part 1 with worked academic solutions for PPSC SDO, FPSC AEE, C&W, Irrigation, NTS.

Questions
40
Difficulty Level
Exam-Level
Target Exams
PPSC SDO, FPSC AEE, C&W...
Estimated Time
48 mins
Exam-Level PPSC SDO FPSC AEE C&W Irrigation NTS
Verified for Commission Syllabus • Oct 14, 2026
40

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/40 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 40
★ PPSC SDO ★ FPSC AEE

Irrigation water having the concentration of Na ++ , Ca ++ and Mg ++ as 20, 3 and 1 Milli equivalent per litre respectively will be classified as

Question 2 of 40
★ PPSC SDO ★ FPSC AEE

The difference in level between the top of a bank and supply level in a canal, is called

Question 3 of 40
★ PPSC SDO ★ FPSC AEE

The state of the soil when plants fail to extract sufficient water for their requirements, is

Question 4 of 40
★ PPSC SDO ★ FPSC AEE

A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If ϕ index remains at the same value, the runoff due to 10 cm of rainfall in 12 hours in the catchment is

Question 5 of 40
★ PPSC SDO ★ FPSC AEE

The main function of a divide wall is to

Question 6 of 40
★ PPSC SDO ★ FPSC AEE

Infiltration is the

Question 7 of 40
★ PPSC SDO ★ FPSC AEE

A fall which maintains its depth, is

Question 8 of 40
★ PPSC SDO ★ FPSC AEE

For a catchment area of 120 km 2 , the equilibrium discharge in m 3 /hour of an S-curve obtained by the summation of 6 hour unit hydrograph is

Question 9 of 40
★ PPSC SDO ★ FPSC AEE

If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be

Question 10 of 40
★ PPSC SDO ★ FPSC AEE

The unit hydrograph due to a storm may be obtained by dividing the ordinates of the direct runoff hydrograph by

Question 11 of 40
★ PPSC SDO ★ FPSC AEE

Finally formed berms in canals are provided for

Question 12 of 40
★ PPSC SDO ★ FPSC AEE

Canals constructed for draining off water from water logged areas, are known

Question 13 of 40
★ PPSC SDO ★ FPSC AEE

A hydroelectric scheme operating under a head of 80 m will be classified as

Question 14 of 40
★ PPSC SDO ★ FPSC AEE

If d 1 is the depth of cutting, d 2 is the height of the bank from bed level r 2 : 1 and r 1 : 1 are the slopes in filling and cutting respectively, the horizontal distance n between the bed and bank, is

Question 15 of 40
★ PPSC SDO ★ FPSC AEE

A minimum of 90 cm free board is provided if the discharge in the canal is between

Question 16 of 40
★ PPSC SDO ★ FPSC AEE

If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is

Question 17 of 40
★ PPSC SDO ★ FPSC AEE

The structure constructed to allow drainage water to flow under pressure through an inverted syphon below a canal, is called

Question 18 of 40
★ PPSC SDO ★ FPSC AEE

The downstream expansion head of a guide bank is extended to subtend an angle at the centre, equal to

Question 19 of 40
★ PPSC SDO ★ FPSC AEE

The uplift pressure on a dam can be controlled by i) constructing cutoff under upstream face ii) constructing drainage channels bet-ween the dam and its foundation iii) by pressure grouting in foundation The corret answer is

Question 20 of 40
★ PPSC SDO ★ FPSC AEE

If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be

Question 21 of 40
★ PPSC SDO ★ FPSC AEE

The width of a meander belt is the transverse distance between

Question 22 of 40
★ PPSC SDO ★ FPSC AEE

The ratio of average values of shear stresses produced on the bed and the banks of a channel due to flowing water is

Question 23 of 40
★ PPSC SDO ★ FPSC AEE

The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be

Question 24 of 40
★ PPSC SDO ★ FPSC AEE

The main function of a diversion head works of a canal from a river, is

Question 25 of 40
★ PPSC SDO ★ FPSC AEE

The amount of irrigation water required to meet the evapotranspiration needs of the crop during its full growth is called

Question 26 of 40
★ PPSC SDO ★ FPSC AEE

For wave action in dams, the maximum height of freeboard is generally taken to be equal to (where hw is height of wave.)

Question 27 of 40
★ PPSC SDO ★ FPSC AEE

The intensity of irrigation means

Question 28 of 40
★ PPSC SDO ★ FPSC AEE

Trap efficiency of a reservoir is a function of

Question 29 of 40
★ PPSC SDO ★ FPSC AEE

Seepage through embankments in an earthen dam is controlled by

Question 30 of 40
★ PPSC SDO ★ FPSC AEE

A river is said to be of

Question 31 of 40
★ PPSC SDO ★ FPSC AEE

An artesian aquifer is the one where

Question 32 of 40
★ PPSC SDO ★ FPSC AEE

For a unique design of a channel by Kennedy's theory

Question 33 of 40
★ PPSC SDO ★ FPSC AEE

The scour depth D of a river during flood, may be calculated from the Lacey's equation

Question 34 of 40
★ PPSC SDO ★ FPSC AEE

Unit of runoff in M.K.S. system is

Question 35 of 40
★ PPSC SDO ★ FPSC AEE

Under the same conditions, which of the following shapes of water surface will give the highest rate of evaporation ?

Question 36 of 40
★ PPSC SDO ★ FPSC AEE

The main cause of meandering is

Question 37 of 40
★ PPSC SDO ★ FPSC AEE

According to Kennedy, the critical velocity (V 0 ) in meters in a channel is the mean velocity which keeps the channel free from silting or scouring. Its value is given by (where m is critical velocity ratio and D is the depth of the channel).

Question 38 of 40
★ PPSC SDO ★ FPSC AEE

A 70% index of wetness means

Question 39 of 40
★ PPSC SDO ★ FPSC AEE

Useful soil moisture for plant growth, is

Question 40 of 40
★ PPSC SDO ★ FPSC AEE

The flow of water after spilling over the weir crest in chute spillway and side channel spillway respectively are

✓ Link copied to clipboard
Continue Your Practice

Airport Engineering — Part 1

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Civil Engineering

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Civil Engineering

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →