Skip to main content

Irrigation Engineering — Part 2 MCQs with Explanations

Practice high-yield Civil Engineering MCQs on Irrigation Engineering — Part 2 with worked academic solutions for PPSC SDO, FPSC AEE, C&W, Irrigation, NTS.

Questions
40
Difficulty Level
Exam-Level
Target Exams
PPSC SDO, FPSC AEE, C&W...
Estimated Time
48 mins
Exam-Level PPSC SDO FPSC AEE C&W Irrigation NTS
Verified for Commission Syllabus • Oct 14, 2026
40

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/40 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 40
★ PPSC SDO ★ FPSC AEE

V and R are the regime mean velocity and hydraulic mean depth respectively in meters. Lacey's silt factor f is

Question 2 of 40
★ PPSC SDO ★ FPSC AEE

The length of a meander is the distance along the river between the tangent point of one curve to the tangent point of

Question 3 of 40
★ PPSC SDO ★ FPSC AEE

A multipurpose reservoir is the one which is

Question 4 of 40
★ PPSC SDO ★ FPSC AEE

A divide wall is provided

Question 5 of 40
★ PPSC SDO ★ FPSC AEE

The consumptive use of water for a crop

Question 6 of 40
★ PPSC SDO ★ FPSC AEE

The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to

Question 7 of 40
★ PPSC SDO ★ FPSC AEE

The useful moisture of soil, is equal to its

Question 8 of 40
★ PPSC SDO ★ FPSC AEE

The uplift pressure on the roof of an inverted syphon, is maximum when

Question 9 of 40
★ PPSC SDO ★ FPSC AEE

The water face of the guide banks, is protected by

Question 10 of 40
★ PPSC SDO ★ FPSC AEE

The length and width of a meander and also the width of the river, vary roughly as

Question 11 of 40
★ PPSC SDO ★ FPSC AEE

Wetted perimeter of a regime channel for a discharge of 64 cumecs as per Lacey’s theory will be

Question 12 of 40
★ PPSC SDO ★ FPSC AEE

A counter berm is

Question 13 of 40
★ PPSC SDO ★ FPSC AEE

The uplift pressure on the face of a drainage gallery in a dam is taken as

Question 14 of 40
★ PPSC SDO ★ FPSC AEE

A deep well

Question 15 of 40
★ PPSC SDO ★ FPSC AEE

The most suitable section of a lined canal, is

Question 16 of 40
★ PPSC SDO ★ FPSC AEE

Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ?

Question 17 of 40
★ PPSC SDO ★ FPSC AEE

The sensitivity of a rigid module is

Question 18 of 40
★ PPSC SDO ★ FPSC AEE

In a syphon aqueduct

Question 19 of 40
★ PPSC SDO ★ FPSC AEE

For an annual flood series arranged in descending order of magnitude, the return for a magnitude listed at position period m in a total data N is

Question 20 of 40
★ PPSC SDO ★ FPSC AEE

The width of a dowla is generally kept between 30 to 60 cm and its height above the road level should invariably be more than

Question 21 of 40
★ PPSC SDO ★ FPSC AEE

The ratio of the discharge over a trapezoidal crest to a rectangular crest of Sarda falls of identical parameters, is

Question 22 of 40
★ PPSC SDO ★ FPSC AEE

A fall in a canal bed is generally provided, if

Question 23 of 40
★ PPSC SDO ★ FPSC AEE

As compared to gravity dams, earthen dams

Question 24 of 40
★ PPSC SDO ★ FPSC AEE

Bed bars in a canal are provided

Question 25 of 40
★ PPSC SDO ★ FPSC AEE

The depth of water required to bring the soil moisture content of a given soil upto its field capacity is called

Question 26 of 40
★ PPSC SDO ★ FPSC AEE

Which of the following can be used as a meter fall ?

Question 27 of 40
★ PPSC SDO ★ FPSC AEE

The value of Sodium Absorption Ratio for high sodium water lies between

Question 28 of 40
★ PPSC SDO ★ FPSC AEE

If D is the depth of water upstream of the throat above its sill, B is the width of the throat, to achieve critical flow in an open venturi flume, the theoretical maximum flow Q, is

Question 29 of 40
★ PPSC SDO ★ FPSC AEE

If d is the depth of the aquifer through which water is flowing, then the relationship between permeability k and transmissible T is given by

Question 30 of 40
★ PPSC SDO ★ FPSC AEE

Borrow pits should preferably be located in

Question 31 of 40
★ PPSC SDO ★ FPSC AEE

Pick up the incorrect statement from the following. Culturable commanded area is the gross area of an irrigation canal system less

Question 32 of 40
★ PPSC SDO ★ FPSC AEE

In gravity canals, F.S.L. is

Question 33 of 40
★ PPSC SDO ★ FPSC AEE

Which of the following types of rain gauges is used for measuring rain in remote hilly inaccessible areas ?

Question 34 of 40
★ PPSC SDO ★ FPSC AEE

If $$\Delta $$ is the depth of water in metres, B is the number of days of base period and D is the duty in hectare/cumec, the relationship which holds good, is

Question 35 of 40
★ PPSC SDO ★ FPSC AEE

The ratio of rate of change of the discharge of an outlet to the rate of change of the discharge of distributing channel is called

Question 36 of 40
★ PPSC SDO ★ FPSC AEE

To determine the discharge at a section in a stream from its rating curve, the required data are i) slope of water surface at the section ii) stage at the section iii) current meter readings at the section The correct answer is

Question 37 of 40
★ PPSC SDO ★ FPSC AEE

Variability of rainfall is i) largest in regions of high rainfall ii) largest in coastal areas iii) largest in regions of scanty rainfall The correct answer is

Question 38 of 40
★ PPSC SDO ★ FPSC AEE

Interception losses are due to i) evaporation ii) transpiration iii) stream flow The correct answer is

Question 39 of 40
★ PPSC SDO ★ FPSC AEE

The forces, which are considered for the analysis of an elementary profile of a gravity dam under empty reservoir condition, are i) Water pressure ii) Self weight iii) Uplift iv) Pressure due to earthquake The correct answer is

Question 40 of 40
★ PPSC SDO ★ FPSC AEE

If straight sides of a triangular section of a lined canal with circular bottom of radius R, make an angle θ with horizontal, the area of its cross-section, is

✓ Link copied to clipboard
Continue Your Practice

Airport Engineering — Part 1

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Civil Engineering

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Civil Engineering

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →