Skip to main content

Tunnel Engineering — Part 2 MCQs with Explanations

Practice high-yield Civil Engineering MCQs on Tunnel Engineering — Part 2 with worked academic solutions for PPSC SDO, FPSC AEE, C&W, Irrigation, NTS.

Questions
29
Difficulty Level
Exam-Level
Target Exams
PPSC SDO, FPSC AEE, C&W...
Estimated Time
35 mins
Exam-Level PPSC SDO FPSC AEE C&W Irrigation NTS
Verified for Commission Syllabus • Oct 14, 2026
29

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/29 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 29
★ PPSC SDO ★ FPSC AEE

For transferring the tunnel alignment through shafts, we adopt the following steps: 1.Hanging two or more plumb lines in the shaft 2.Determining the bearing of the plumb lines i.e. plumb plane 3.Suspending a 35 kg weight by each plumb line 4.Immersing the weights of both the plumb lines in the buckets containing water The correct sequence of steps is:

Question 2 of 29
★ PPSC SDO ★ FPSC AEE

Which one of the following is considered to be an advantage of the heading and benching method of tunnel construction?

Question 3 of 29
★ PPSC SDO ★ FPSC AEE

Which one of the following methods is generally adopted for tunnelling in firm ground

Question 4 of 29
★ PPSC SDO ★ FPSC AEE

Which of the following is not a component of the shield?

Question 5 of 29
★ PPSC SDO ★ FPSC AEE

Which one of the following statements is not correct for heading and benching method of tunnelling?

Question 6 of 29
★ PPSC SDO ★ FPSC AEE

Which one of the following statements is not correct with regard to heading and henching method of tunnelling?

Question 7 of 29
★ PPSC SDO ★ FPSC AEE

What is the correct sequence of the following events in rock tunnelling? 1. Marking tunnel profile 2. Loading explosives and blasting 3. Checking misfire 4. Mucking 5. Removing foul gas 6. Setting up and drilling 7. Guniting Select the correct answer

Question 8 of 29
★ PPSC SDO ★ FPSC AEE

An overhead track on a large truss frame is required in case of car changer by

Question 9 of 29
★ PPSC SDO ★ FPSC AEE

Pick up the explosive used for tunnelling in soft rocks from the following:

Question 10 of 29
★ PPSC SDO ★ FPSC AEE

Pick up the mechanical ventilation method used for tunnels from the following:

Question 11 of 29
★ PPSC SDO ★ FPSC AEE

Pick up the correct statement regarding drilling a tunnel from the following:

Question 12 of 29
★ PPSC SDO ★ FPSC AEE

If ‘N’ is the number of shafts used, then the total number of faces available for attacking the excavation and construction in tunnels are

Question 13 of 29
★ PPSC SDO ★ FPSC AEE

For highways, tunnelling is preferred to if the open cut exceeds:

Question 14 of 29
★ PPSC SDO ★ FPSC AEE

Forepoling method is generally adopted for tunnelling in:

Question 15 of 29
★ PPSC SDO ★ FPSC AEE

A tunnel is found more advantageous as compared to the alternate routes because it:

Question 16 of 29
★ PPSC SDO ★ FPSC AEE

The needle beam method of tunnelling (i) Is suitable for soils in which roof can stand for few minutes without support (ii) Is suitable for brick lining (iii) Is suitable for concrete lining (iv) Requires large number of trench jacks

Question 17 of 29
★ PPSC SDO ★ FPSC AEE

Concrete lining is provided concurrently with the driving operation in case of

Question 18 of 29
★ PPSC SDO ★ FPSC AEE

In “full face” method of constructing tunnels, the first operation relates to

Question 19 of 29
★ PPSC SDO ★ FPSC AEE

The following operations are generally employed for tunnelling in hard rock. 1.Removing ground water, 2.Loading holes and firing the explosive 3.Setting up and drilling 4.Grouting and lining 5.Removing muck 6.Ventilation and removing explosion dust The correct sequence is:

Question 20 of 29
★ PPSC SDO ★ FPSC AEE

In the given figure drill holes, heading, mucking and benching are numbered as 1, 2, 3, 4; The correct sequence is:

Question 21 of 29
★ PPSC SDO ★ FPSC AEE

American method of tunnelling (i) Is suitable for large sized tunnels (ii) Is not suitable for railway or highway tunnels (iii) Requires heavy timbers

Question 22 of 29
★ PPSC SDO ★ FPSC AEE

If ‘D’ is the diameter of tunnel in meters, then the thickness of lining in mm, as per the empirical formula is given by

Question 23 of 29
★ PPSC SDO ★ FPSC AEE

As compared to a single free face, if a charge of explosive is placed equidistant from two faces, then the yield

Question 24 of 29
★ PPSC SDO ★ FPSC AEE

Assertion A: When rock conditions are favorable, it will not be necessary to take up concrete lining concurrently with the driving operations till the full length of the tunnel has been driven through rock. Reason R: A tunnel through rock, hard or soft, does not need any concrete lining Select your answer

Question 25 of 29
★ PPSC SDO ★ FPSC AEE

Assertion A: English method of tunnelling requires more time as compared to other methods of tunnelling. Reason R: In English method of tunnelling, the masons and excavators have to work alternately Select your answer

Question 26 of 29
★ PPSC SDO ★ FPSC AEE

Drift method of tunneling is used to construct tunnels in

Question 27 of 29
★ PPSC SDO ★ FPSC AEE

The following tunnels were constructed in different countries for different purposes: 1.Emperor Claudius built the first Roman tunnel 2.The first highway tunnel was constructed in Hungary 3.The first underground railway tunnel was constructed in Great Britain 4.The first navigational tunnel was constructed in France. The correct chronological development of these tunnels is:

Question 28 of 29
★ PPSC SDO ★ FPSC AEE

Pick up the correct statement from the following during tunnel excavation,

Question 29 of 29
★ PPSC SDO ★ FPSC AEE

In case of drift method of tunnelling, the drift may be excavated at

✓ Link copied to clipboard
Continue Your Practice

Airport Engineering — Part 1

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Civil Engineering

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Civil Engineering

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →