Skip to main content

Coal Mining — Part 1 MCQs with Explanations

Practice high-yield Mining Engineering MCQs on Coal Mining — Part 1 with worked academic solutions for PPSC Mines, KPPSC, FPSC, BPSC.

Questions
40
Difficulty Level
Exam-Level
Target Exams
PPSC Mines, KPPSC, FPSC...
Estimated Time
48 mins
Exam-Level PPSC Mines KPPSC FPSC BPSC
Verified for Commission Syllabus • Oct 14, 2026
40

Verified Practice Questions

Interactive test mode with detailed academic worked solutions

Live Progress | 0/40 answered
✓ 0 correct ✗ 0 wrong 0% score
Question 1 of 40
★ PPSC Mines ★ KPPSC

Forced drop shaft method employed in

Question 2 of 40
★ PPSC Mines ★ KPPSC

The wattage of bulb in a cluster of each bulb

Question 3 of 40
★ PPSC Mines ★ KPPSC

The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .

Question 4 of 40
★ PPSC Mines ★ KPPSC

The purpose of pilot hole in stable pit drivage

Question 5 of 40
★ PPSC Mines ★ KPPSC

Scaffold not required in . . . . . . . . tubbing

Question 6 of 40
★ PPSC Mines ★ KPPSC

Bord and pillar method applied when a seam is

Question 7 of 40
★ PPSC Mines ★ KPPSC

The following method practiced in NECL (Assam) for extraction of steep thick seam.

Question 8 of 40
★ PPSC Mines ★ KPPSC

Transportation of filled material with water to the worked out areas for filling called . . . . . . . .

Question 9 of 40
★ PPSC Mines ★ KPPSC

In double tube core barrel which tube is non rotating

Question 10 of 40
★ PPSC Mines ★ KPPSC

The face or working place which is parallel to main cleat is called . . . . . . . .

Question 11 of 40
★ PPSC Mines ★ KPPSC

With 3 or 4 stooks under extraction at a time, the total area should not exceed . . . . . . . . m 2

Question 12 of 40
★ PPSC Mines ★ KPPSC

Horizontal slicing method applied if seam thickness is

Question 13 of 40
★ PPSC Mines ★ KPPSC

The type of sinking employed in unstable friable strata with heavy rush of water

Question 14 of 40
★ PPSC Mines ★ KPPSC

Seam thickness more than 8m and regular dip <60°, strong roof and floor, no self heating with easily cavable roof. Select best method.

Question 15 of 40
★ PPSC Mines ★ KPPSC

The cut coal is loaded by . . . . . . . . In case of shear.

Question 16 of 40
★ PPSC Mines ★ KPPSC

The groove made by coal cutting machine is called

Question 17 of 40
★ PPSC Mines ★ KPPSC

On the mixing cone, there is a screen to prevent pebbles larger than . . . . . . . . mm size from getting into shaft range with sand water mixing.

Question 18 of 40
★ PPSC Mines ★ KPPSC

Hangers placed at intervals of

Question 19 of 40
★ PPSC Mines ★ KPPSC

The power available in under ground at a voltage of

Question 20 of 40
★ PPSC Mines ★ KPPSC

The coal mining areas where the maximum drilling depth is upto

Question 21 of 40
★ PPSC Mines ★ KPPSC

In longwall face cut by double back shuffle, can be only worked with

Question 22 of 40
★ PPSC Mines ★ KPPSC

Freezing process of shaft sinking introduced by

Question 23 of 40
★ PPSC Mines ★ KPPSC

The stowing pipes in pneumatic stowing made of

Question 24 of 40
★ PPSC Mines ★ KPPSC

In which line of extraction one solid stook intervenes between two stooks under extraction at a time.

Question 25 of 40
★ PPSC Mines ★ KPPSC

OMS achieved by B. G method is more than . . . . . . . .

Question 26 of 40
★ PPSC Mines ★ KPPSC

Crane or grab used for clearing the debris upto a depth of . . . . . . . .

Question 27 of 40
★ PPSC Mines ★ KPPSC

Gallery in the process of being driven

Question 28 of 40
★ PPSC Mines ★ KPPSC

The extended portionof gate roads in L/W called

Question 29 of 40
★ PPSC Mines ★ KPPSC

The bord and pillar method adopted of the coal scam is thicker than . . . . . . . .

Question 30 of 40
★ PPSC Mines ★ KPPSC

The life of the M. S pipe used in sand stowing in lac ton of sand.

Question 31 of 40
★ PPSC Mines ★ KPPSC

Without derrick holes can be drilled depth of

Question 32 of 40
★ PPSC Mines ★ KPPSC

Under ground gassification, development done towards

Question 33 of 40
★ PPSC Mines ★ KPPSC

Cable drilling employed commonly employed for holes deeper than

Question 34 of 40
★ PPSC Mines ★ KPPSC

In drilled shafts all the sinking work can be carried out by

Question 35 of 40
★ PPSC Mines ★ KPPSC

Continuous record of bore hole deviation from top to bottom by an instrument by

Question 36 of 40
★ PPSC Mines ★ KPPSC

While driving slices, what should be the minimum thickness of rib of coal to be left against adjacent goaf.

Question 37 of 40
★ PPSC Mines ★ KPPSC

Pumps are employed when the make of water in the shaft exceed

Question 38 of 40
★ PPSC Mines ★ KPPSC

Common rate of sand stowing in μ/g mines is A tons of sand per hour. Value of A is given by . . . . . . . .

Question 39 of 40
★ PPSC Mines ★ KPPSC

The number of panels to be opened at a time decided by

Question 40 of 40
★ PPSC Mines ★ KPPSC

Water infusion of coal face in ploughing causes.

✓ Link copied to clipboard
Continue Your Practice

Coal Mining — Part 2

Master the next curriculum module with 40 exam-standard MCQs.

Next Practice Set →

💡 Examiner's Advisory for Mining Engineering

In competitive commission exams (FPSC, PPSC, KPPSC, SPSC, CSS, PMS), questions are frequently phrased with distractor options designed to catch rote learners. Whenever you answer an MCQ, read the Detailed Academic Explanation and Conceptual Anchor to understand why the remaining options are incorrect.

More Modules in Mining Engineering

View All →
📚

Study Guides

Topic summaries and syllabus breakdown

Explore Guides →
🎯

Complete Library

Search through 78,000+ verified MCQs

Browse Library →
📱

Mobile App

Offline mock tests and instant bookmarks

Get Mobile App →